Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

贵州太阳能光伏发电打桩安装公司

打水泥桩、打光伏孔、打光伏孔桩、打光伏水泥桩、打光伏螺旋地桩、光伏发电安装、...

sell
  • There is no classification
contact
  • Contact:孙志刚
  • Phone:18380326523
  • Email:810060212@qq.com
search
 
link
  • There is no link yet
home > sell > Drilling photovoltaic holes, where is the team for drilling photovoltaic holes, professional drilling of photovoltaic holes, and photovoltaic drilling teams
Drilling photovoltaic holes, where is the team for drilling photovoltaic holes, professional drilling of photovoltaic holes, and photovoltaic drilling teams
products: Views:5Drilling photovoltaic holes, where is the team for drilling photovoltaic holes, professional drilling of photovoltaic holes, and photovoltaic drilling teams 
price: 面议
MOQ: 1 口
Total supply:
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: Long-term validity
Last updated: 2016-08-23 16:52
 
Details
Drilling photovoltaic holes, where is the team for drilling photovoltaic holes, professional drilling of photovoltaic holes, and photovoltaic drilling teams. The work needs to be carried out carefully. It is achieved by hydroforming a tubular metal patch. A pair of removable metal patches is inserted into the patch. A tool for inflating packers spaced axially from each other by a distance substantially equal to the length of the patch, with the tool positioned within the patch such that the packer is in contact with the end of the patch To partially align the packer, insert the assembly consisting of the tool and patch axially into the well or pipe, and position the assembly in alignment with the repair area. Open the packer by inflating it to a high pressure sufficient to allow the patch to open. The end portions expand radially and cause them to press against the wall of the well or pipe in a leak-tight manner, allowing the packer to retract and the tool to be retrieved to complete the well replenishment operation. Secondly, there are well replenishment solutions such as lining, adding cement, and piston hard pull. The application of specific solutions must be applied by detecting the degree and location of the rupture position through underground television. An effective well replenishment plan determines the success or failure of the well replenishment construction. Therefore, Operations must be carried out with caution and decisions made through discussion with technical personnel.
Business scope radiates
Expanding to Guizhou, Yunnan, Sichuan, Chongqing, Guangxi, Hunan, Hubei, Jiangsu, Anhui, Henan, Jiangxi,
Beijing, Shanghai, Tianjin, Hebei, Shanxi, Inner Mongolia, Heilongjiang, Jilin, Liaoning, Zhejiang, Fujian, Shandong, Guangdong, Hainan, Tibet, Shaanxi, Gansu, Qinghai, Ningxia, Xinjiang,
and other provinces and cities.
Request for quotation
A total of0articles  Related Comments: